Commercial-Grade EV Charging for Daily Operations

Maxperr Eco Level 2 Charger

Reliable Level 2 charging solution designed for commercial properties, workplaces, and multi-unit residential deployments. OCPP-compliant, weatherproof, and built for 24/7 operation.

Get a Quote

Power Output

7.2-12 kW

Connector

SAE J1772

Rating

NEMA 4X

Protocol

OCPP 1.6J/2.0.1

Maxperr Eco Level 2 Charger

Key Highlights

Enterprise-grade features engineered for reliability and long-term infrastructure deployment.

Flexible Power Delivery

Adjustable output from 7.2 kW to 12 kW enables optimization for site electrical capacity and vehicle charging requirements.

All-Weather Operation

NEMA 4X rated enclosure provides reliable operation in outdoor environments with full protection from rain, snow, dust, and corrosion.

Real-Time Monitoring

Built-in cellular and Ethernet connectivity delivers live status updates, energy consumption tracking, and remote diagnostics.

Open Protocol Compatible

OCPP 1.6J and 2.0.1 support ensures compatibility with major network management platforms and future integration flexibility.

Wide Operating Range

Operates reliably in temperatures from -30°C to 50°C, suitable for diverse climate conditions across North America.

Serviceable Design

Modular components and field-replaceable parts minimize downtime and reduce long-term total cost of ownership.

Applications

Proven infrastructure solutions for diverse operational environments and business requirements.

Commercial Parking

Workplace and retail parking facilities requiring overnight or extended stay charging for employee and customer vehicles.

Fleet Depots

Light-duty fleet operations with overnight depot charging and managed load distribution across multiple charging stations.

Multi-Unit Residential

Apartment complexes and condominiums providing tenant charging amenities with integrated billing and access control.

Destination Charging

Hotels, restaurants, and entertainment venues offering charging amenities for extended patron visits and overnight stays.

Technical Specifications

Detailed technical specifications for engineering and procurement teams.

Power Output
7.2 - 12 kW (adjustable)
Input Voltage
208-240 VAC, Single Phase / Split Phase
Input Current
30-50 A (configurable)
Connector Type
SAE J1772 (IEC Type 1)
Cable Length
7.6 m (25 ft) standard
Communication Protocol
OCPP 1.6J / OCPP 2.0.1
Connectivity
Ethernet, WiFi, 4G LTE
Operating Temperature
-30°C to 50°C (-22°F to 122°F)
Protection Rating
NEMA 4X / IP66
Mounting Options
Wall-mount or pedestal
Dimensions (W x H x D)
330 x 610 x 180 mm (13" x 24" x 7")
Weight
18 kg (40 lbs)
Certifications
UL 2594, CSA C22.2, Energy Star
Warranty
3 years standard, 5 years extended available

Why Maxperr

Built for real-world deployments with a focus on reliability, serviceability, and total cost of ownership.

Designed for Long-Term Deployment

Built with commercial-grade components rated for continuous 24/7 operation and outdoor installation. Modular design enables field service and component replacement without full unit replacement.

Network-Agnostic Integration

OCPP compliance ensures compatibility with major network management platforms including ChargePoint, EV Connect, and custom enterprise systems. Avoid vendor lock-in while maintaining full feature access.

Remote Management and Diagnostics

Cloud-connected platform enables remote firmware updates, real-time diagnostics, and proactive maintenance scheduling. Reduce site visit requirements and operational overhead.

Scalable Infrastructure Investment

Standardized mounting and electrical interface simplifies multi-site deployments and future capacity expansion. Compatible with Maxperr load management systems for optimized site electrical utilization.

Documentation & Resources

Technical documentation and installation guides for your team.

Frequently Asked Questions

Common questions from procurement and engineering teams.

Ready to Deploy This Solution?

Connect with our team to discuss specifications, pricing, site requirements, and deployment timelines for your infrastructure project.